External Facade Progressing Well
TMpdg is working successfully alongside the government body, Melbourne Metro Tunnel Authority, ensuring construction of the Metro Tunnel infrastructure project and the Bond St project are not hindered, despite their close proximity.
Level 4 Slab & Structure Complete
Level 2 and Level 3 Slabs
Ground Floor and Level 1 Slabs
Basement 1 and Ground Floor Slabs
Piling, Bulk Excavation & Basement 2
Copyright © 2018 TM Property Development Group - All Rights Reserved